PAC PLANNER - C O N C R E T E |
Add/Edit Concrete Cost. (1)_Right Click on an area element. Select "Add Cost" or "Edit Cost" from the "Concrete" submenu. (2)_Add/Edit Concrete window is shown. Parameters are entered. (3)_Next to the "Remove" from "Concrete" submenu the cost value is updated. |
Overview Concrete Cost. (1)_Right Click on an area element. Select "Overview Concrete Cost" from the "Concrete" submenu. (2)_Table with the detailed concrete cost is shown. (3)_Pressing the "Export to XSL" button exports the details in a file readable in Excel. |
|||
Concrete Report. (1)_Select "Concrete" from the Report menu. (2)_Table with all detailed concrete cost is shown. (3)_Pressing the "Export to XSL" button exports the details in a file readable in Excel. |
||||